Home
Home Divider The Tunnel Divider Toll Divider FAQs Divider Contact
 Customer Login
The Tunnel
Trip Planner
Tunnel Route Map
Spend less time driving and more time living
Travel Times
Facts
How much does it cost?
Urban Design
Motorway Conditions of Use
Tunnel Maintenance
Tunnel Safety
Toll
Air Quality
Media Room

Scheduled maintenance for August 2010

17/5/2010

The Cross City Tunnel will be closed for scheduled maintenance commencing on the following dates:

Eastbound on 16 and 17 August from 10pm to 5am.

Westbound on 18 and 19 August from 10pm to 5am.

Maintenance works scheduled for August will involve a full closure of the eastbound or westbound carriageways over consecutive nights (i.e. only one direction will be closed for maintenance works on any one night). As a result minor disruptions to the balance of the CCT ventilation system air flow may occur. These interruptions will be infrequent and may result in unpreventable partial portal emissions (i.e. a majority of the air will continue to be discharged from the stack). Every effort will be taken to minimise the length of a portal emission.

Please note, these works have been scheduled for night periods (10pm-5am) where traffic in the live carriageway will be low, therefore air pollutant concentrations within the tunnel will be minimal.

Copyright © 2010 CCT Motorway Group Holding PTY Limited

 

Privacy Policy

 

Terms of Use

 

Sitemap

 

Useful Information